滦河电厂2×300MW 机组为新建机组,凝结水100%通过精处理,精处理再生方式为高塔法,氨化运行。在调试过程中发现树脂分离塔传阳树脂时阳树脂中夹杂较多阴树脂,导致混床再生不好,出水水质不达标,无法实现氨化运行。本文深入探讨了传阳脂时夹杂阴脂现象的形成原因,对可能的解决方案进行了比较,并筛选出了最优解决方案。该方案经过在滦河电厂精处理的应用,效果良好,为精处理乃至电厂的安全运行打下了良好基础。

名词对照
凝结水精处理 condensate polishing
树脂 resin
输送 transfer
氨化运行 ammoniated operation
火电厂 thermal power plant
阴树脂 anion resins
阳树脂 cation resins
高塔法 high-tower separation technique
树脂分离塔 spt
混床 mixed resin bed
再生 regeneration
水质 water quality



5.17炉膛的封闭要求严密,锅炉本体保温结束,捞渣机水封可投入,所有烟风挡板均可关闭,观察孔、人孔、烟道风道、捞渣机水封等部位在化学清洗期间必须具备封闭条件,减少散热损失,以免降低升温速度而影响化学清洗质量,临时清洗管道和蒸汽管道需进行保温工作。
5.18 锅炉基本具备点火条件,确保锅炉化学清洗后二十天内能点火吹管。
6 化学清洗临时系统安装及临时措施实施
6.1 汽包顶部排气管走向应一路向上,最后对空,排气管总有效通流面积不小于φ100。
6.2 汽包内部的旋风分离器在酸洗前应拆除或不装,并进行处理,待化学清洗后再回装。

名词对照

烟风挡板 air & flue gas damper
捞渣机水封 water seal of slag scraper machine
排气管 exit pipe
炉膛 furnace
保温 thermal insulation
看火孔 observation hole
人孔 man hole
化学清洗 chemical cleaning
吹管 flushing
汽包 STEAM DRUM
旋风分离器 cyclone separator
锅炉 boilers
锅炉本体 boiler proper
风道 air duct
烟道 gas pass

准确说是两段 ,再强调一遍,不要鸡翻
最佳答案
Luanhe thermal power plant 2×300MW units are new ones. 100% of condensate water is polished, by High tower seperation technique and ammoniated operation. In the debug, it's found that there are lots of anion resins in cation resins when cation resins are transferred in spt. This results in bad regeneration in mixed resin bed and unqualified water quality. So ammoniated operation cannot be carried out. This article discusses deeply about the reason why cation resins are mixed with anion resins when transferred in spt, compares the feasible solutions and chooses the best one. This solution is carried out in condensate polishing in Luanhe power plant. It performs well and lay a solid foundation for the secure operation of condensate polishing, even of the whole plant.

5.17 The sealing of prunace should be rigorous. Water seal of slag scraper machine can be launched after boiler proper being heat-preserved. All ari&flue gas damper can be closed. Examination hole, man hole, gas pass, air duct, water seal of slag scraper machine and so on, should be provided with sealing condition during chemical cleaning. So as to reduce loss of heat, and avoid the decrease of heating up speed, which will affect the quality of chemical cleaning. Thermal insulation should be carried out when pipe and steam pipe are cleaned temporarily.
5.18 Generally, the boiler is provided with condition of firing up. So as to ensure that it can be fired up and flushed in 20 days after the chemical cleaning.
6 Temporary system installation and temporary measures in chemical cleaning
6.1 The exit pipe above the steam drum should be always up and up to the air at last. The effective discharge area of exit pipe should be no less than φ100.
6.2 The cyclone separator in the steam drum should be dismanted or uploaded and be well treated before acid washing, then be loaded after chemical cleaning.

本人一向鄙视机译,不知道底楼的结论从哪来。有能耐你也给个手译的来。
全部回答
Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation. 5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work. 5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe. 6 chemical cleaning of the provisional system installation and implementation of interim measures 6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100. 6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.
Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation. Term control Condensate Polishing condensate polishing Resin resin Conveyor transfer Ammoniated ammoniated operation run Thermal power plant thermal power plant Anion resin anion resins Yang resin cation resins Tower France high-tower separation technique Resin separation tower spt Mixed-bed mixed resin bed Regeneration regeneration Water quality water quality Two 5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work. 5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe. 6 chemical cleaning of the provisional system installation and implementation of interim measures 6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100. 6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded. Term control Smoke wind baffle air & flue gas damper Slag seal water seal of slag scraper machine Exhaust exit pipe Hearth furnace Insulation thermal insulation Look at the fire-hole observation hole Manhole man hole Chemical cleaning chemical cleaning Blowpipe flushing Drum STEAM DRUM Cyclone cyclone separator Boiler boilers Boiler boiler proper Air duct air duct Flue gas pass 希望能帮助你
意思 Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation. Two 5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work. 5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe. 6 chemical cleaning of the provisional system installation and implementation of interim measures 6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100. 6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.
滦河电厂2×300MW 机组为新建机组,凝结水100%通过精处理,精处理再生方式为高塔法,氨化运行。在调试过程中发现树脂分离塔传阳树脂时阳树脂中夹杂较多阴树脂,导致混床再生不好,出水水质不达标,无法实现氨化运行。本文深入探讨了传阳脂时夹杂阴脂现象的形成原因,对可能的解决方案进行了比较,并筛选出了最优解决方案。该方案经过在滦河电厂精处理的应用,效果良好,为精处理乃至电厂的安全运行打下了良好基础。 Luan River Power Plant 2 × 300MW units for new units, condensing water, 100% through the fine processing, fine processing of renewable way for tower law, ammoniation runs. Was found in the debugging process resin separation columns Yang Chuan-yang resin mixed with more resin anion resin, resulting in poor regeneration of mixed beds, water quality below standards, can not be achieved ammoniation to run. This paper discusses in depth when the mixture of lipid Yin Chuan-yang phenomenon of the formation of fat causes, possible solutions were compared, and selected the optimal solution. The program went through in the Luan River Power Plant refined processing applications, good results for the fine treatment as well as the safe operation of power plants has laid a good foundation. 5.17炉膛的封闭要求严密,锅炉本体保温结束,捞渣机水封可投入,所有烟风挡板均可关闭,观察孔、人孔、烟道风道、捞渣机水封等部位在化学清洗期间必须具备封闭条件,减少散热损失,以免降低升温速度而影响化学清洗质量,临时清洗管道和蒸汽管道需进行保温工作。 5.18 锅炉基本具备点火条件,确保锅炉化学清洗后二十天内能点火吹管。 6 化学清洗临时系统安装及临时措施实施 6.1 汽包顶部排气管走向应一路向上,最后对空,排气管总有效通流面积不小于φ100。 6.2 汽包内部的旋风分离器在酸洗前应拆除或不装,并进行处理,待化学清洗后再回装。 5.17 The closure of the furnace demands tight boiler insulation end, Slag seal can be put into all the smoke wind baffle can be closed to observe the hole, man hole, flue duct, Slag and other parts of the water seal during the chemical cleaning must have closed condition, reduce heat loss, so as not to reduce the heating rate to affect the quality of chemical cleaning, temporary cleaning pipes and steam pipes in need of insulation work. 5.18 Boiler basically have the ignition conditions to ensure that the boiler chemical cleaning to fire within 20 days after the blowpipe. 6 chemical cleaning of the provisional system installation and implementation of interim measures 6.1 drum at the top of the exhaust pipe to be all the way up towards the end of the air, the exhaust pipe total effective flow area not less than φ100. 6.2 Drum inside the cyclone in pickling should be removed or not installed before, and process until the chemical cleaning and then back loaded.
凝结水精处理 condensate polishing 树脂 resin 输送 transfer 氨化运行 ammoniated operation 火电厂 thermal power plant 阴树脂 anion resins 阳树脂 cation resins 高塔法 high-tower separation technique 树脂分离塔 spt 混床 mixed resin bed 再生 regeneration 水质 water quality
我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
温泉鱼庄怎么去啊,有知道地址的么
老年人右边耳朵听力突然下降了 怎么回事
【问红尘】不问红尘是什么、解释意思
北京百年智库商贸有限公司 有谁知道这家公司
2个月博美吃多少狗粮
成语什么如雨下
Fields of hope
750克纯牛奶对多少乳酸菌酸奶
岔孟固勒在什么地方啊,我要过去处理事情
如果你女朋友心机重的话你会怎么办。
板式家具生产一般用什么软件
谁给推荐一款双网双待的手机啊!! 我想要两
小孩被开水烫伤用蛇油擦效果好吗
沙洲上地址在什么地方,想过去办事
宫口扩张曲线的活跃期,正确的是A.约需8小时
推荐资讯
读图,回答问题。【小题1】天上“神舟”翱翔
电视机内置wifi好不好
45度斜长能用什么方法算出来?
如果天塌下来,地震,沙尘暴,瘟疫,海啸,火
洗车人家汽车美容服务连锁我想知道这个在什么
关于塑料的特性,以下哪个不正确?A.密度小,
沈阳利珠公司地址在哪,我要去那里办事
为什么有的人朋友圈每刷一次都会显示的不一样
2006年7月1日,世界上最高、最长的高原铁路—
宿舍可以插50瓦的夹板么
铁路车票代售点喀什莎车县联通新城路营业厅在
公务员我已经各省的加起来考了5次了,这次江
正方形一边上任一点到这个正方形两条对角线的
阴历怎么看 ?