【监控系统安装流程图】...系统的开发过程包括顺序功能流程图、UML建模语言、梯形图
答案:2 悬赏:80 手机版
解决时间 2021-02-20 22:46
- 提问者网友:感性作祟
- 2021-02-20 18:39
【监控系统安装流程图】...系统的开发过程包括顺序功能流程图、UML建模语言、梯形图
最佳答案
- 五星知识达人网友:孤独的牧羊人
- 2021-02-20 19:15
【答案】 The basic compostion of both software and hardware of the control subsystem and monitoring subsystem, the interface configuration of communication links, connection modes of different components and application environment are described in this article. First, the development process of control subsystem includes Sequential Funtion Chart, UML (Unified Modeling Language) and application of Ladder Diagram. Modularization programming idea is used to split the complicated large-scale system, which is then simplified into several relatively independent small modules. One of the small modules is developed as basis on which the main program is compiled step by step, to simplify the programming process and enhance the efficiency. Second, the designing method of monitoring subsysem is described, which is consist of three parts: modular structure, configuration of confugurable monitoring system and the application of configurable C Language script. The function of each module and the method of the man-machine interactive configuration interface are described, and a few sample program of C Language script are listed.
花了近一个小时,是否机器翻译的,自己判断吧!
花了近一个小时,是否机器翻译的,自己判断吧!
全部回答
- 1楼网友:独钓一江月
- 2021-02-20 20:43
收益了
我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
推荐资讯