【m安轨】英语翻译安装说明:1.安装支架1用M12X50六角头螺钉.2.安装轨道2;...
答案:2 悬赏:50 手机版
解决时间 2021-02-28 22:57
- 提问者网友:最美的风景
- 2021-02-28 16:46
【m安轨】英语翻译安装说明:1.安装支架1用M12X50六角头螺钉.2.安装轨道2;...
最佳答案
- 五星知识达人网友:三千妖杀
- 2021-02-28 18:21
【答案】 Installation instructions:
1.M12X50 mounting bracket with a hexagonal head screws.
2.Installation of track 2,3,4,attention to the width 316 MM.Motor orbit round the track and there around the end of the points,while the other hit a block slot,the other side does not.Motor see from one end of the block hit the right end,the figure.
3.Installation of the electrical 5,the electrical header 6,block-to hit the side of the low side,figure,the host 7 mouth blown into host,have installed a good track-8 host,stainless steel door to the side of the end of round ,The first installation of the end of the block 10,installed last round 11,hit the block for the low side to side,Figure.To install collision-for-9 block,block and hit the attention of the location of fork in place and accurate.
4.Installation of suction cotton site 12; 13; 14; 15; 16; 17,14 slider attention on the rubber plate and 90 PVC pipe contact with the plane formation installed seal,90 PVC pipe in a 110-host the middle.
5.Installation of the wind blowing suction tube parts,installing 18; 19; 20; 21; 22; 23 24 26 29 30.Installed after the support arm 25 into one end of connecting with the host side,PVC winds blowing straw and the host of soft straw with bellows 27,110 directly connected with 31,with 28 jets hoop clamping.
6.Belts installed 32
1.M12X50 mounting bracket with a hexagonal head screws.
2.Installation of track 2,3,4,attention to the width 316 MM.Motor orbit round the track and there around the end of the points,while the other hit a block slot,the other side does not.Motor see from one end of the block hit the right end,the figure.
3.Installation of the electrical 5,the electrical header 6,block-to hit the side of the low side,figure,the host 7 mouth blown into host,have installed a good track-8 host,stainless steel door to the side of the end of round ,The first installation of the end of the block 10,installed last round 11,hit the block for the low side to side,Figure.To install collision-for-9 block,block and hit the attention of the location of fork in place and accurate.
4.Installation of suction cotton site 12; 13; 14; 15; 16; 17,14 slider attention on the rubber plate and 90 PVC pipe contact with the plane formation installed seal,90 PVC pipe in a 110-host the middle.
5.Installation of the wind blowing suction tube parts,installing 18; 19; 20; 21; 22; 23 24 26 29 30.Installed after the support arm 25 into one end of connecting with the host side,PVC winds blowing straw and the host of soft straw with bellows 27,110 directly connected with 31,with 28 jets hoop clamping.
6.Belts installed 32
全部回答
- 1楼网友:罪歌
- 2021-02-28 19:46
谢谢了
我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
推荐资讯