永发信息网

汉译英,要准确翻译,不要翻译器翻译的

答案:2  悬赏:10  手机版
解决时间 2021-04-26 13:59

根据季节性的室外光线变化及是否存在阴雨天气的影响,设定不同的系统上电时间,系统上电后,按上图3的流程实施教室的节能用电设置。由于天气的变化对光线的影响比较明显,除上述自动控制外,还应能够结合手动的调节。另外,新的用电设备的加入等特殊情况的用电事先预留控制端口,方便加入整体控制。

教室用电控制的所有节电均为终端节点,通过ZigBee将信号无线传输到各个教室的协调器节点,由协调器节电将信息通过RS232总线或GPRS方式传送到控制中心,由控制中心做出相关响应信息,经由协调器节点,到达各个终端节点,选择灯的亮、灭及亮度,选择相应的节能用电模式。

 

最佳答案

Based on the seasonal changes in outdoor light and the effect of rainy weather, it sets a different system of power-on time. After the systerm is power-on, according to the process of the Figure 3, it sets to implement energy-saving classroom. As the weather changing  obviously impact on the light, in addition to the above-mentioned automatic control, it should also be combined with manual adjustment. Moreover, the addition of new electrical equipment and other special situations electricity  reserve control port in advance to facilitate the accession to the overall control.


Energy saving control of the classroom are terminal nodes. The wireless signal through ZigBee transmit to the coordinator node in each classroom. The coordinator node sends the information through the RS232 bus or GPRS to the control center. Relevant responsing information, which is made by the control center , through the coordinator node to reach each terminal node, select the lights on, off and brightness, and select the appropriate energy saving pattern.

全部回答

According to the change of seasonal and whether there are outdoor light, the rainy weather effects on different systems, system electric power according to the above three after the implementation of the electricity energy flow. Due to the change of weather effects of light, in addition to the obvious automatic control, still should be able to manually adjust the combination. In addition, the new electric equipment to the power of the special circumstances, such prior obligate control ports, convenient to join the whole control.

All of the power control for terminal node, electricity ZigBee through wireless transmission to the signal of the tuner node, the coordinator electricity-saving information through RS232 bus or GPRS to control center, the way to control center by relevant information via coordinator, response to each node, the choice of the lamp, end nodes, bright brightness, and select the energy saving electricity mode.

我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
什么时候看到的月亮最大?
SOFU SOFO地址在什么地方,想过去办事
雪梅茶餐吧在哪里啊,我有事要去这个地方
工作上犯了错误,趁中秋节怎么跟领导送祝福
我用的是7610,我把密码该用的是字母可是开机
风云之问鼎天下的客户热线多少吖,有情人说下
家美乐的哪一款产品是针对敏感肤质的啊?
帮看一下这笔记本电脑(七喜v415)怎样.
为什么只有一部分图标可以
如何做为一优秀的员工???
怎么卸载一个软件?(本身不带卸载程序。)
谁能送我只宝宝,
情人节到了,该送什么给暗恋的人呢?
DNF怎么跟新不了
广东省阳江的渔船用电违法吗
推荐资讯
聪明的哥哥姐姐帮我想个口号吧!
中国石拱桥(课文)的说明句子
眼睛哭肿了怎么办?
我的N86是联通定制手机,移动的卡能用吗
月经隔一个月没来但有时来两个月又隔一个月没
东莞去珠海车费多少钱啊
宝宝早上起床后给他吃什么给他开胃让他等伙多
单选题关于早期殖民扩张的认识,正确的是①是
服装公司机修工的朋友帮忙回答下
dnf+10的蛇眼极光剑能卖多少
老是拉肚子是怎么回事
索爱T707的手动换歌应该怎么用?
正方形一边上任一点到这个正方形两条对角线的
阴历怎么看 ?