永发信息网

【水立方介绍】鸟巢和水立方的英文简介?

答案:2  悬赏:60  手机版
解决时间 2021-03-09 05:58
【水立方介绍】鸟巢和水立方的英文简介?
最佳答案
【答案】 Beijing National Stadium (Bird's Nest/Olympic Stadium)
  The Beijing National Stadium,also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies.In 2002 Government officials engaged architects worldwide in a design competition.Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition.The stadium will seat as many as 100,000 spectators during the Olympics,but this will be reduced to 80,000 after the games.It has replaced the original intended venue of the Guangdong Olympic Stadium.The stadium is 330 metres long by 220 metres wide,and is 69.2 metres tall.The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel,with a combined weight of 45,000 tonnes.The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR).The ground was broken in December 2003,and construction started in March 2004,but was halted by the high construction cost in August 2004.
  In the new design,the roof of the stadium had been omitted from the design.Experts say that this will make the stadium safer,whilst reducing construction costs.The construction of the Olympic buildings will continue once again in the beginning of 2005.
  水立方
  With the year of 2007 approaching,good news came from the construction sites of the Olympic projects -- the membrane structure of the outside layer of the National Aquatics Center was completed on the morning of December 26.
  Construction of the landmark project,also called the Water Cube, officially started on December 24,2003.The work on concrete and steel structures was finished in July 2006.On August 1 this year,installation of cushions of membrane structure was officially launched.
  With the closure of the outside membrane layer project,the installation of inside cushions will be under way,in a synchronized manner with the indoor fit-up and decoration.Installation of electromechanical equipment and pipes is currently going on and indoor fit-up and decoration will start by the end of the year.The whole project will be completed at the end of 2007.
  In accordance with the plan,the venue test event will be launched at the National Aquatics Center in February 2008.
  The material of membrane structure is called ETFE,or ethylene-tetra-fluoro-ethylene,used for the first time in China.It is also the largest and most complicated membrane system in a single building project internationally.The construction staff of the National Aquatics Center completed all works and fulfilled the goal as planned after overcoming many difficulties,successfully carrying out membrane structure research and independent innovative construction practice.
全部回答
收益了
我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
汇城名酒总汇在哪里啊,我有事要去这个地方
这的笔顺怎么写
老马兰州牛肉拉面分店地址在哪,我要去那里办
联通卡销户是不是要第二个月才生效 也就是说
唯恩诗家的那款智妍光肌祛痘的怎么样?求告知
样品无商业价值,仅供报关使用.英语怎么表达
嘉兴石膏天花装饰部在什么地方啊,我要过去处
每亩水体水深1米用80-150g,一立方用多少?
银镯子钢印是F&C Ag9999 是什么意思?
学日语教材标准日语初级上册学完这本后能学到
下列管理工具和方法中,可用于项目成本管理的
联华诸光店地址在哪,我要去那里办事
海尔双缸洗衣机甩桶电机不用电容通电会转 m.x
8月2日是个好日子吗?
查烟台汽车站到烟台港多远
推荐资讯
宫颈糜烂做了HPV检查阴性,患宫颈癌的机率大
多肉砍头后老桩怎么养
瑞金路办居住证在哪
请网友推荐下,什么微博值得关注的,除了明星
问一下,我身高153cm,体重132斤,腰围90cm,
反应慢,网络打开特别慢
海尔洗衣机xqg70一b10288显示e4
搜狐焦点房产怎么样
企业资产负债表中存货项目的期末数应包括()。
沈阳站到桃仙机场有机场大巴吗? 坐大巴多少
这个牛仔裤配什么颜色的外套好看,还有什么鞋
首付124800贷款二十八万二十年还清利息是百分
正方形一边上任一点到这个正方形两条对角线的
阴历怎么看 ?