A town in Oxfordshire has become the first in the UK to have biomethane(生物甲烷)gas from human waste piped to their homes for gas central heating and cooking.
Up to 200 families in Didcot now receive the gas via the national gas power system. Head of energy and technology at British Gas, Martin Orrill, said customers wouldn’t notice any difference as the gas is purified(提炼)to the highest standard and has no smell. The gas is produced at a sewage(污物)treatment works plant in Didcot.
The entire process takes only less than three weeks, with the sewage being collected and sent first to settlement tanks. The solid waste material is then fed into digesters, where anaerobic bacteria(厌氧菌)digest the sewage, with the aid of enzymes(酶)to speed up the process. The digestion process produces methane, which can be burned to drive machines to produce electricity, or can be purified and fed into the gas network and piped to homes and businesses. British Gas says supplying the gas rather than electricity is far more efficient since around two-thirds of the energy is lost in producing electricity.
Partners in the Didcot project, British Gas, Scotia Gas Networks, and Thames Water, all hope to expand the process to other towns, and other companies such as Ecotricity and United Utilities have also announced biomethane projects being planned. One of these projects, in Manchester, could be supplying 500 homes with biomethane by mid next year. Another British Gas project in Suffolk will provide gas from digestion of brewery wastes to around 235 families.
The Didcot project cost £2.5m and was influenced by promises of government aids aimed at encouraging companies to develop renewable technologies. An EU directive means the UK must ensure at least 15 percent of its energy is from renewable sources by 2020.
The UK produces about 1.73 million tons of sewage annually. If all sewage treatment works in the UK were fitted with the technology, they could supply gas for up to 350,000 families.
【小题1】Which of the following is true of the biomethane gas?A.It’s mainly made from rotting plants.B.It’s an environmentally friendly gas.C.Its production process is too long.D.It’s easily recognized by the customers.【小题2】What is the function of the enzymes?A.To digest the solid waste material.B.To help get rid of anaerobic bacteria.C.To help purify the biomethane.D.To speed up the digestion process.【小题3】According to British Gas, the biomethane gas had better be used .A.as the power for the vehiclesB.for the heating and cookingC.to produce the electricityD.to drive a variety of machines【小题4】The last three paragraphs mainly show that .A.UK government supports the biome thane projectsB.the biome thane projects are very costlyC.the biome thane projects still face many barriersD.the biome thane projects are promising【小题5】What should the text belong to?A.Computer science.B.Engineering.C.Energy.D.Business.B
A town in Oxfordshire has become the first in the UK to have biomethane(生物甲烷)gas from huma
答案:2 悬赏:0 手机版
解决时间 2021-04-13 02:09
- 提问者网友:两耳就是菩提
- 2021-04-12 15:54
最佳答案
- 五星知识达人网友:爱难随人意
- 2021-04-12 16:12
(答案→)B 解析:可联系答.案.网客服索取。
全部回答
- 1楼网友:轻熟杀无赦
- 2021-04-12 17:27
这下我知道了
我要举报
如以上问答信息为低俗、色情、不良、暴力、侵权、涉及违法等信息,可以点下面链接进行举报!
大家都在看
推荐资讯